I have finished with modding the hop unit for a bridge nub. All that's left to do now is wait till I can test it. I had to mill out the hop unit towards the rear of the hop unit, meaning I was able to leave at least 50% of the tread on the front part of the unit to still use the same screw to adjust the hop. The milling took the longest, where I had to let the unit and my Dremel cool down due to it heating up while using the diamond bit.
__________________
current armament: mk43, ump.45, p90, barret, m14, g33, k98, m4 tac, m4 swat, mp5 navy, vsr10, p226, m9.
|