Another update... I got sick of using random tools avaliable so I purchased a cordless 11.1v Dremel tool... Get in
Done some work to the Launcher grip, sliced it up and going to do a split design. Been grinding down the Grenade Launcher with the dremel today to get the other grip section to fit. Needs more work but heres some photos to show the way its heading..
Ummmmmm XM108HP..... Powerfull..... With XC03 C02 adaptor
Really want the Stock and the Flash hider now to arrive so i can start butchering those up
Forgot to add a quick power test of the energy levels. The master switch is needed for the gun with this because as soon as the day out starts the meter will keep an eye on power consumption and lower battery levels.