View Single Post
Old November 3rd, 2008, 20:23   #3
pugs144
 
Join Date: Aug 2003
Location: At the entrance to the Big Top
Spread the load by zip-tie/paracording to 2 - 3 MOLLE attachment points.
pugs144 is offline   Reply With Quote